TR263D Platform Security and Policy Management R17.0.1
Maturity Level: General availability (GA)
Document version: 1.0.4
Release Status: Production
Details:
This document is part of a multi-part series (i.e, TR263) that provides implementer guidelines for common integration challenges when using Platform, SoA and Open API concepts. It addresses the challenge of securing software which is being orchestra...
Standard(s): Best Practices
TR263A Coordination Terminology and Classification of Associated Problems R17.0.1
Maturity Level: Level 4 - Forum Approved
Document version: 1.0.4
Release Status: Archived
Details:
This document is part of a series of documents under the umbrella of TR263. It covers basic terminology, and a statement of basic (albeit difficult) problems related to orchestration and choreography.
Standard(s): Best Practices
Deployment Integration Patterns and Best Practices for HIP: Overview R17.0.1 (TR263)
Maturity Level: General availability (GA)
Document version: 1.0.4
Release Status: Production
Details:
This document provides an overview and introduction to a series of Technical Reports that provide deployment Integration patterns and best practices for hybrid Infrastructure Platforms (HIP) . Some of the patterns have wider applicability than infra...
Standard(s): Best Practices
Poster da Estrutura de Applicação versão 16.5
Release Status: Archived
Details:
Faça o download da versão em Português do poster ilustrando a Estrutura de Applicação, atualizado na versão do Frameworx 16.5. Clique no botão “Download PDF” à direita. Somente para Membros.
Standard(s): Application Framework (TAM)
TMF071 Terminology for Zero-touch Orchestration, Operations and Management R17.0.1
Maturity Level: Level 4 - Forum Approved
Document version: 0.4.1
Release Status: Archived
Details:
This document provides a short glossary of terminology used within ZOOM documentation published in Release 17.
Standard(s): Best Practices
TMF070 Implementation and Deployment Blueprints for Hybrid Environments R17.0.1
Maturity Level: Level 4 - Forum Approved
Document version: 0.3.1
Release Status: Archived
Details:
This document serves as an overview for several other documents (TMF070A and TMF070B) that provide detailed implementation and deployment blueprints for various platforms that can be used to manage hybrid environments.
Standard(s): Best Practices
TMF070B Advanced Platform Deployment Blueprints R17.0.1
Maturity Level: Level 4 - Forum Approved
Document version: 0.5.1
Release Status: Archived
Details:
This document describes implementation and deployment platform blueprints beyond the one described in TMF070A (i.e., HIP). The document covers enhancements to the HIP described in TMF070A, HIP variations (e.g., Customer Facing HIP) and additional pla...
Standard(s): Best Practices
TMF070A Hybrid Infrastructure Platform (HIP) Implementation and Deployment Blueprint R17.0.1
Maturity Level: Level 4 - Forum Approved
Document version: 0.6.1
Release Status: Archived
Details:
This document describes an Implementation and Deployment Blueprint for the Hybrid Infrastructure Platform (HIP). Additional details on HIP can be found in TR262 Hybrid Infrastructure Platform Blueprint R17.0.0. Note: In a few places (in other docume...
Standard(s): Best Practices
TAM Impacts by SDN/NFV: Detailed Analysis and Implementation SQA R17.0.1 (IG1130B)
Maturity Level: General availability (GA)
Document version: 1.0.2
Release Status: Production
Details:
The current document is an addendum to the original TM Forum ZOOM Project document "IG1130 Future TAM Impacts by SDN/NFV". The target of the addendum document is to perform detailed analysis of SDN/NFV impacts, based on the high-level study presented...
Standard(s): Best Practices
IG1137A Development and Deployment in the Context of a Value Fabric: Joint Agile Delivery R17.0.1
Maturity Level: Level 4 - Forum Approved
Document version: 1.0.5
Release Status: Archived
Details:
IG1137 introduced the concept of transformation from NetOps to DevOps in an NFV/ZOOM context. The intent of that transformative process was to break the silos between Development and Operations in order to work efficiently in a value fabric. This do...
Standard(s): Best Practices
IG1158 Operations Center of the Future – Future Roles, Competencies and Culture R17.0.1
Maturity Level: Level 4 - Forum Approved
Document version: 1.0.2
Release Status: Archived
Details:
This document outlines future roles and competencies required by a Communications Service Provider (CSP) within the Operations Center of the Future. It is the result of a collaborative project which identified critical activities, defined key roles ...
Standard(s): Best Practices
GB921DX L4 Process Decompositions R17.0.1
Maturity Level: Level 4 - Forum Approved
Document version: 17.0.2
Release Status: Archived
Details:
This document represents Volume 2 of GB921D containing processes and sub-process descriptions.
Standard(s): Application Framework (TAM)