ratio (to total of nominally successful attempts) of VM instances that are delivered to the NFV consumer or VNF which purport to be fully operational but actually contain some latent configuration or other fault which prevents the VNFC hosted in the VM instance from entering user service (i.e., it never reaches the "T=0" event)<br/>
Description: team-specific category 1 (for BMS, this is the "BMS Domain")
category2
Orchestration
Details:
Description: team-specific category 2 (for BMS, this is the "BMS Domain")
category3
Resource allocation, Configuration & Setup
Details:
Description: team-specific category 3 (for BMS, this is the "BMS Domain")
entrydate
3/21/2016 12:00:00 AM
Details:
Description: date when metric was defined or added
gid
4
Details:
Description: Group ID, assigned by domain team responsible for metric (BMS, CEM, SLA, etc.); start with 1 and increment, but can be whatever team decides. Note this is different from tid, ntid, and dtid (TMForum IDs), since these can only be assigned by metrics team at maturity level 4
group
ZMPE
Details:
Description: TMForum group/team that is responsible for the metric definition
maturity
1-Proposed
Details:
Values: 1-Proposed,2-Defined,3-Validated,4-Normalized,5-Benchmarked Description: Maturity Level is an enumeration of maturity stages ranging from "One" to "Five", as per TM Forum Frameworx conventions. Maturity Level is typically associated to a Version Descriptor and Frameworx Business Metric selects the latest from the maturity history
metrictype
Non-Calculated
Details:
Values: Ratio,Non-Ratio,Non-Calculated Description: specifies whether metric is a Ratio (a specific kind of formula), Non-Ratio (other kind of formula), or Non-Calculated (ie, given, with no calculation needed or provided)
tid
1758
Details:
Description: TMForum ID, assigned by central metrics team