<font color="#29313b">Table 3 shows ProjectElement timing constraints. These are used to determine the scheduled times when there is enough slack to allow the timing to vary. Note that timing conflicts may occur between the relationships and constraints and this will need to be addressed by an application implementing this model. </font><br/>